There is no single, specific end date by which all U.S. government data centers will be built, powered, and online. The process is an ongoing cycle of consolidation, optimization, and new construction driven by evolving technology and policy.  

Federal data center initiatives have shifted focus over time: 

Past Initiatives (Consolidation and Optimization): The Federal Data Center Consolidation Initiative (FDCCI) and its successor, the Data Center Optimization Initiative (DCOI), aimed to reduce the number of inefficient data centers, achieve cost savings, and transition to more efficient infrastructure like cloud services. While significant progress has been made in closing hundreds of centers and achieving billions in savings, this was an ongoing process without a final "all done" date, as agencies continually report on progress. The specific legislative provisions for the prior DCOI effort sunset on September 30, 2026.

Current Initiatives (AI and Modernization): The current focus is on modernizing existing infrastructure and building new, specialized data centers, particularly for artificial intelligence (AI) and High-Performance Computing (HPC).

The Department of Energy (DOE) has identified federal sites for new AI data centers with a target of commencing operation by the end of 2027.

Related federal actions include streamlining permitting processes and developing new energy sources, which are part of a multi-year effort to build out necessary infrastructure. 

In essence, the "completion" date is a moving target as technology and governmental needs evolve, moving from a focus on consolidation to one of modernization and expansion into advanced AI capabilities. 

There is no single date for when all U.S. government data centers will be "complete," as federal policy has shifted from simple construction toward a continuous cycle of consolidation, modernization, and transition to cloud services. 

As of early 2026, the following timelines define the current landscape for federal data center infrastructure:

Key Policy and Operational Deadlines

September 30, 2026: This is a critical sunset date for the Federal Data Center Enhancement Act

(FDCEA) of 2023. Agencies are currently working under OMB Memorandum M-25-03, which requires them to meet baseline standards for reliability, cybersecurity, and resiliency by this date.

End of 2027: The Department of Energy (DOE) has identified 16 federal sites for a new wave of AI-powered data centers. The target for these specific facilities to commence operations is the end of 2027. 

Construction and Modernization Milestones

2026 Peak Spending: U.S. data center construction spending is projected to peak in 2026 at approximately $89 billion, a massive surge driven largely by the need for high-density AI infrastructure.

Transition to Cloud: Under the "Cloud Smart" strategy, agencies are moving away from building new physical facilities. Many agencies, such as the Department of Health and Human Services (HHS), have successfully closed numerous physical centers by migrating to cloud-based hosts through 2026.

Power and Interconnection: New federal directives aim to "rapidly accelerate" the connection of large-scale data centers to the power grid. A final rule to standardize and speed up this process is expected by April 30, 2026. 

Ongoing Evolution

The definition of "online" is evolving as the government moves toward:

Colocation Agreements: Tech companies are now being permitted to plug data centers directly into power plants to meet massive energy demands as of late 2025.

Advanced Cooling: In 2026, new builds are increasingly adopting liquid cooling (direct-to-chip or immersion) as a standard to handle high-density AI workloads.

Resiliency Focus: 2026 marks a shift toward "resilient innovation," ensuring that as data centers come online, they are not just efficient but capable of withstanding cyber incidents and budget fluctuations. 